Ohio DPS-Licensed Driver Training School · License No. 4261Call us: 1-866-749-4445

Ohio DPS-Licensed Driver Training School License No. 4261

New Albany Ohio Online Driver's Ed

New Albany deserves one of the strongest city pages in Licking County because its roadway network is changing rapidly.

The city lies in both Franklin and Licking Counties.

A Skillful Driver offers Ohio online driver education for beginning drivers, qualifying Abbreviated Adult Driver Training applicants and Limited Term applicants.

Learning to Drive in New Albany: Roundabouts, Market Street and SR 161

New Albany's current road environment is substantially different from almost every other city in this batch.

Market Street Extension

The Market Street Extension is now open and connects the Village Center more directly with Dublin-Granville Road and U.S. 62.

The project includes a roundabout at Market Street and Reynoldsburg-New Albany Road and a reconstructed connection toward U.S. 62.

In April 2026, the city specifically advised drivers that the Market Street Extension had become the preferred route for reducing stops through the Village Center.

For a beginning driver, this provides important practice with:

Roundabout entry

Yield decisions

Lane positioning

New route patterns

Transitioning between village streets and U.S. 62

Third Street Is Now Market Street

New Albany officially renamed the former Third Street section between Granville Street and Main Street as Market Street in May 2026. New signs are in place.

This is exactly the kind of city-specific detail that matters to a new driver using GPS or older directions.

State Route 161 and U.S. 62

New Albany's SR 161 interchange at Johnstown Road/U.S. 62 was substantially improved, including added ramp lanes, bike facilities, leisure trails and pedestrian-safety features.

This gives students experience moving between:

Limited-access SR 161

U.S. 62

Local New Albany roads

Roundabouts

Bicycle and pedestrian infrastructure

Active Green Chapel Road Construction

Green Chapel Road between Clover Valley Road and U.S. 62 is being reconstructed in 2026.

The city states that the project includes pavement widening, curb, storm sewer, a leisure trail and a new traffic signal at U.S. 62. Substantial completion is planned by December 31, 2026.

STATUS: ACTIVE 2026 CONSTRUCTION.

Jug Street Reconstruction

New Albany also began reconstruction of Jug Street between Clover Valley Road and Mink Street in June 2026.

The project restricts Jug Street to eastbound traffic during much of the work, with westbound traffic detoured.

STATUS: ACTIVE THROUGH LATE 2026.

SR 605 / New Albany-Condit Road

The city began SR 605 reconstruction between Snider Loop and Central College Road in 2026, including pavement widening, curbs, lighting, on-street parking and utility work.

This is another current New Albany road environment that should not be copied onto Pataskala or Johnstown pages.

New Albany High School

New Albany High School is located at:

7600 Fodor Road

New Albany, OH 43054

The city's construction planning has specifically taken New Albany-Plain Local Schools bus and student traffic into account when scheduling road closures.

City FAQ

New Albany Ohio Online Driver's Ed FAQ

Answers to common questions about online driver education, licensing steps, and local requirements in New Albany, Ohio.

Can I take Ohio driver's ed online from New Albany?

Yes. Eligible New Albany residents can complete the applicable A Skillful Driver online course.

Is New Albany in Licking County?

Partly. New Albany is located in both Franklin and Licking Counties.

Do ages 18 through 20 need Ohio driver's ed?

Yes, most beginning applicants in those ages now need Class D driver education.

Does A Skillful Driver offer adult driver training?

Yes. Qualifying adults can use its separate Abbreviated Adult Driver Training course.

Does it offer Limited Term driver education?

Yes. Limited Term applicants are a separate Ohio licensing and course pathway.

Is the Market Street Extension open?

Yes. The project opened to traffic in December 2025 and is now an important route toward U.S. 62.

Was Third Street renamed?

Yes. The section between Granville Street and Main Street is now officially Market Street.

Is Green Chapel Road under construction?

Yes. Reconstruction is active in 2026 between Clover Valley Road and U.S. 62.

Is Jug Street under construction?

Yes. The 2026 reconstruction affects Jug Street between Clover Valley Road and Mink Street.

Where is New Albany High School?

7600 Fodor Road.

Where should a New Albany resident go for BMV services?

The best location depends on the resident's address because the city spans Franklin and Licking Counties. Licking County options include Johnstown, Pataskala and Newark.

Start Your New Albany Ohio Driver's Ed Online

Complete the applicable A Skillful Driver online course, then finish the behind-the-wheel, supervised-driving, testing and BMV requirements that apply to your licensing status.

NEW ALBANY INTERNAL APPENDIX

Page Qualification: PRIMARY CITY PAGE

Course Coverage: All three YES.

Unique Content:

Franklin/Licking County split

Market Street Extension

New Market Street naming

Market/Reynoldsburg-New Albany roundabout

SR 161/U.S. 62 interchange

Green Chapel Road construction

Jug Street reconstruction

SR 605 work

New Albany High School/Fodor Road

High Freshness: Green Chapel, Jug Street, SR 605.

Local Uniqueness Result: PASS

5. NEWARK, OHIO

Ready to Register in New Albany?

Complete the Ohio online driver education theory portion from home, then arrange any required behind-the-wheel training separately with an Ohio-licensed driving school.

Register Now